Administration

EAHCP is a collaborative effort by the Edwards Aquifer Authority, the City of New Braunfels, the City of San Marcos, the City of San Antonio through SAWS, Texas State University, and Texas Parks and Wildlife

Science Committee Meeting Documents

March 8, 2017

Agenda

Attachment 1: November 10, 2016 Meeting Minutes

Attachment 2: 2016 Net Disturbance & Incidental Take Assessment

Attachment 3: 2016 Salvage Refugia Research Program Report

Attachment 4: 2016 Applied Research results: Evaluation of CSRB Life History (Year 1)

Attachment 5: 2016 Expanded Water Quality Monitoring Report

Attachment 6: 2016 Comal Biological Monitoring Report

Attachment 7: 2016 San Marcos Biological Monitoring Report

Attachment 8: Review of the Edwards Aquifer Habitat Conservation Plan: Report 2

Attachment 9: Proposed 2017 methodology (BIO-WEST): Statistical analysis of the San Marcos & Comal Springs aquatic ecosystems biomonitoring dataset 

Attachment 10: Proposed 2017 methodology (Beaver Creek): Statistical analysis of the San Marcos & Comal Springs aquatic ecosystems biomonitoring dataset

Attachment 11: Proposed 2017 methodology (UTSA): Statistical analysis of the San Marcos & Comal Springs aquatic ecosystems biomonitoring dataset

Attachment 12: Charge of the Research Work Group

Attachment 13: San Marcos AMP Implementation Table

Attachment 14: Nonroutine AMP Proposal - Substitution of Sedimentation Ponds Under "Minimizing Impacts of Contaminated Runoff"

Attachment 15: Charge of the San Marcos Water Quality Protection Work Group

Presentations

Program Manager Update

Summary of the NAS Report 2 Evaluation of the EAHCP

Creation of the Research Work Group

BIO-WEST Stat Analysis Methods Presentation

Beaver Creek Stat Analysis Methods Presentation

UTSA Stat Analysis Methods Presentation

2017 Nonroutine AMP San Marcos and Texas State Water Quality Protection Measures

December 15, 2016 - Joint Meeting

Agenda

Please visit the December 15, 2016 - Joint Meeting Implementing Committee meeting documents page for all attachments and copies of presentations from this meeting.

November 10, 2016

September 9, 2016

June 22, 2016

May 13, 2016

March 11, 2016

Agenda

Attachment 1: November 11, 2015 Meeting Minutes

Attachment 2: Proposed methodology: Evaluation of the long-term elevated temperature and low dissolved oxygen tolerances of larvae and adult Comal Springs Riffle Beetle

Attachment 3: Proposed methodology: Evaluation of the trophic level status and functional feeding group categorization of larvae and adult Comal Springs Riffle Beetle

Attachment 4: Proposed methodology: Evaluation of the life history of the Comal Springs Riffle Beetle from egg to adult

Attachment 5: 2015 Take Estimate & Habitat Disturbance Report

Attachment 6: 2015 Refugia results: Development of husbandry and captive propagation techniques for invertebrate species covered under the EAHCP

Attachment 7: 2015 Applied Research results: Comal Springs Riffle Beetle habitat connectivity study

Attachment 8: 2015 Applied Research results: Ludwigia repens interference plant competition study

Attachment 9: 2015 Applied Research results: Algae dynamics study

Presentations

EAHCP Science Committee presentation

Proposed methodology: Evaluation of the long-term elevated temperature and low dissolved oxygen tolerances of larvae and adult Comal Springs Riffle Beetle

Proposed methodology: Evaluation of the trophic level status and functional feeding group categorization of larvae and adult Comal Springs Riffle Beetle

Proposed methodology: Evaluation of the life history of the Comal Springs Riffle Beetle from egg to adult

2015 Take Estimate & Habitat Disturbance Report

2015 Refugia results: Development of husbandry and captive propagation techniques for invertebrate species covered under the EAHCP

2015 Applied Research results: Comal Springs Riffle Beetle habitat connectivity study

2015 Applied Research results: Ludwigia repens interference plant competition study

2015 Applied Research results: Algae dynamics study

November 10, 2015

September 9, 2015

June 10, 2015

May 6, 2015

April 7, 2015

March 11, 2015

February 11, 2015

December 18, 2014- Joint Meeting

November 5, 2014

August 6, 2014

May 12, 2014

May 8, 2014

April 8, 2014

February 26, 2014

February 5, 2014

February 5th Science Commmittee Agenda

Attachment 1 - August Science Committee Meeting Minutes

Attachment 2 - Sessom Creek Sand Bar Removal

Attachment 3 - 2013 Applied Research Results Outline

Attachment 4 - 2013 Applied Research Results

Attachment 5 - Proposed 2015 AR Projects

Attachment 6 - HCP Applied Research Selected Section

Attachment 7 - HCP Bank Stabilization Plan

Attachment 8 - HCP Expanded Water Quality Sampling Report

Attachment 9 - Water Quality Appendices Outline

Attachment 10 - Appendix A - Spring Hydrographs

Attachment 11 - Appendix B - Real Time Water Quality Instrument Records

Attachment 12 - Appendix C - Comal and San Marcos Data

Attachment 13 - Appendix D - Analytical Data Validation Discussion

Attachment 14 - Appendix E - Sample Record

Attachment 15 - Appendix F - Photographs

Attachment 16 - Appendix G - Discussion of deviations

Attachment 17 - Appendix H - Record of Stormwater sampliing

Attachment 18.1a - Appendix I - 2012 Hydrologic Data Report Final

Attachment 18.1b - Appendix I - 2012 Hydrologic Data Report Final

Attachment 18.2 - Appendix I - 2012 Hydrologic Data Report Final

Attachment 18.2 - Appendix I - 2012 Hydrologic Data Report Final

Attachment 18.3 - Appendix I - 2012 Hydrologic Data Report Final

Attachment 18.4 - Appendix I - 2012 Hydrologic Data Report Final

Attachment 18.5 - Appendix I - 2012 Hydrologic Data Report Final

Attachment 19 - Appendix J - EAHCP Workplan

Attachment 20 - Appendix K-Groundwater Quality Monitoring Plan 2013

 1- AR 2013 Lab vs Field Presentation

 2- AR 2013 pH Drift Presentation

 3- AR 2013 Veg Temp Threshold Presentation

 4- AR 2013 Food Source Presentation

 5- AR 2013 Future Recommendations

 6- Sessoms Presentation

 7- NB Bank Stabilization Presentation to Science Committee

 8- EAHCP WQ Science Com Presentation

 

December 19, 2013 Joint Meeting

August 14, 2013

July 15, 2013

7-15-13 Science Committee Agenda

Science Committee Meeting Minutes for May 09, 2013 -Draft Attachment 1

Comal River Surface Water Analytical Report by TestAmerica--Attachment 2 

Comal River Surface Water Bacteria Analytical Report by the San Antonio River Authority--Attachment 3  

San Marcos River Surface Water Bacteria Analytical Report by the San Antonio River Authority--Attachment 4    

San Marcos River Surface Water Analytical Report by TestAmerica Part II--Attachment 5 

San Marcos River Surface Water Analytical Report by TestAmerican Part I--Attachment 6

Additional San Marcos River Surface Water Bacteria Analytical Data by the San Antonio River Authority--Attachment 7 

Comprehensive and Critical Period Monitoring Program to Evaluate the Effects of Variable Flow on Biological Resources in the Comal Springs/River Aquatic Ecosystem Final 2012 Annual Report--Attachment 8

Comprehensive and Critical Period Monitoring Program to Evaluate the Effects of Variable Flow on Biological Resources in the San Marcos Springs/River Aquatic Ecosystem Final 2012 Annual Report--Attachment 9

Old Channel of the Comal River Bank Stablization DRAFT prepared by Freese and Nichols--Attachment 10 

Old Channel of the Comal River Riparian Vegetation Plan DRAFT prepared by Freese and Nichols--Attachment 11 

Old Channel of the Comal River Geomorphic Site Assesment prepared by Freese and Nichols--Attachment 12 

2013 Study Plan for Gill Parasite Activities in the Comal River prepared by BIO-WEST, inc.--Attachment 13  

Memorandum:  Incidental Take Potection Provided by ITP #TE-63663A-0, dated June 05, 2013, prepared by Robert Gulley and Jenna Cantwell (EAHCP Staff)--Attachment 14 

Presentation: 2013 EAHCP Applied Research Update

Presentation: Old Channel of the Comal River Bank Stabilization and Riparian Vegetation

Presentation: Landa Lake/Spring run 3 Riffle Beetle Habitat Restoration

Presentation: EAHCP Aquatic Vegetation Restoration Update

Presentation: EAHCP Gill Parasite and Non-Native Snails

Presentation: EAHCP Bio-Monitoring Update

Presentation: EARIP Habitat Conservation Projects

Presentation: Landa Park Golf Course Integrated Pest Management Plan

 

 

 

 

May 09, 2013

April 3, 2013

February 13, 2013

November 29, 2012

August 31 2012

© 2017 Edwards Aquifer Authority